![]()
Custom Piling Machines, Factory Direct
![]()
Custom Piling Machines, Factory Direct
This CFA piling rig comes in two models, KA-155CFA and KA-285CFA. Drill CFA piles at Φ600–800 mm to 20–30 m, or switch the tooling and drill rotary piles at Φ1500–2200 mm to 40–60 m. Same crawler, same operator, same mobilisation.
CFA piles and rotary piles are normally two machines. Here they share one crawler, one mast and one power pack — you change the tooling, not the machine.
The concrete circuit is plumbed at the factory, so the pumping line, swivel and controls are part of the build, not added after delivery.
In CFA mode the auger displaces soil instead of lifting it out. No muck to cart away and no slurry pond, which is what makes city sites workable.
No second purchase, no second low-bed, no second operator. The same rig takes CFA piles in soft ground and rotary piles in cobble or weathered rock.
Both versions of this CFA piling rig are built on the same crawler chassis, so the difference between them is torque, depth and tooling, not layout.
| Specification | KA-155CFA | KA-285CFA |
|---|---|---|
| Rotary mode: max. torque | 155 kN·m | 285 kN·m |
| Rotary mode: speed | 7–33 r/min | 6–28 r/min |
| Rotary mode: max. diameter | Φ1500 mm | Φ2200 mm |
| Rotary mode: max. depth | 40 m | 60 m |
| CFA mode: max. pile diameter | Φ600 mm | Φ800 mm |
| CFA mode: max. pile depth | 20 m | 30 m |
| Crowd force, push / pull | 155 / 160 kN | 265 / 235 kN |
| Crowd stroke | 3500 mm | 5500 mm |
| Main winch, force / line speed | 180 kN / 60 m/min | 320 kN / 50 m/min |
| Auxiliary winch, force / line speed | 50 kN / 65 m/min | 60 kN / 60 m/min |
| Mast rake, side / forward / back | ±5° / 5° / 15° | ±4° / 5° / 15° |
| Travel speed | 3 km/h | 2 km/h |
| Gradeability | 35% | 35% |
| Track outer width | 3200–4400 mm | 3500–4600 mm |
| Engine | Cummins 260 hp (194 kW) | Cummins 400 hp (294 kW) |
| Hydraulic system pressure | 35 MPa | 35 MPa |
| Concrete pump | Supplied with the machine, matched to pile diameter and pumping distance | |
| Certification | Machine CE certified; ISO 9001 at company level | |
| Operating weight (CFA configuration) | 52 t | 85 t |
| Working dimensions (L×W×H) | 7600×4400×18500 mm | 10500×4600×23600 mm |
| Transport dimensions (L×W×H) | 13000×3200×3500 mm | 17200×3500×3600 mm |
Figures above are for the standard configuration. Pile diameter, pile depth, mast height, low-clearance version, engine emission standard, kelly bar sections and pump size are built to order, and the figures change with the configuration.
Continuous flight auger piles, also called auger cast piles in the US, are built in one pass. In this mode the auger is the drill and the concrete pipe at the same time, so there is no casing and no separate pour.
For background on auger cast piles and drilled foundations, see ADSC, the International Association of Foundation Drilling. The rotary side of this machine follows the same bar practice covered in our guide to the kelly bar.
| Rotary mode | CFA mode | |
|---|---|---|
| Pile size(Max) | Φ2200 mm, 60 m | Φ800 mm, 30 m |
| Ground | Cobble, weathered rock, hard layers | Clay, silt, sand, fill, soft ground |
| Soil removal | Bucket lifts soil out | Soil displaced, no spoil |
| Concrete | Poured later, through a tremie | Pumped through the auger, one pass |
| Site condition | Needs muck-away and usually slurry | Clean site, no slurry pond |
| Speed | Slower, two stages | Fast, drill and pour together |
If the piles are large or the ground is hard, rotary mode does the work. If the piles are smaller and the site has to stay clean, CFA mode is the faster route.
This machine earns its price when you need both pile types. If you only need one method, a single-purpose rig is lighter, simpler and cheaper. The table says where to go instead.
| Your work | Machine | Why |
|---|---|---|
| CFA piles and rotary piles on the same site | This page: KA-155CFA / KA-285CFA | One chassis, two methods, one mobilisation |
| Rotary only, Φ1800 mm, 40–50 m | Foundation drill rig | Lighter machine, 42–50 t, no CFA circuit to carry |
| Rotary only, Φ1800 mm, 15–35 m | Kelly bar drill rig | Compact crawler from 23 t, easier on tight sites |
| Deeper than 60 m or wider than Φ2200 mm | Caisson drill rig | 57–105 m, Φ2000–2700 mm |
| Solar ground screws, no concrete at all | Ground screw machine | Screws the pile in, no pump and no curing |
Not sure which pile type your ground needs? Our guide to types of piling sets out the difference between bored, driven and screw piles.
| What can be changed | What it affects |
|---|---|
| Pile diameter and depth | CFA and rotary limits |
| Mast height, low-clearance version | Working height, transport height |
| Engine emission standard | Power rating, fuel system (China III / IV, Euro V) |
| Concrete pump size | Pumping rate and distance |
| Kelly bar sections, friction or interlocking | Rotary depth |
| Extra attachments | Helical anchors, mixing tools |
Tell us the pile size, the ground and the site limits, and we build the configuration around them. That is the difference between a catalogue machine and a machine that fits.
It is a crawler rig that carries two tooling sets. In CFA mode a hollow auger drills to depth, then concrete is pumped down the centre of the auger as it is withdrawn, so the pile is built in one pass without casing or slurry. In rotary mode the same mast takes a kelly bar and a drilling bucket for larger piles.
Yes, with a tooling change. The same crawler and mast carry either a kelly bar with a drilling bucket for rotary mode, or a hollow auger with the concrete circuit for CFA mode. The CFA circuit is plumbed at the factory, not added afterwards.
KA-155CFA reaches Φ600 mm CFA piles to 20 m, or Φ1500 mm rotary piles to 40 m. KA-285CFA reaches Φ800 mm CFA piles to 30 m, or Φ2200 mm rotary piles to 60 m. Depth also depends on the kelly bar sections and the ground.
Yes. The pump is supplied with the machine and matched to the pile diameter and the pumping distance, so the rig arrives able to pour.
One purchase instead of two, one low-bed instead of two, and one operator instead of two. On a site that needs both pile types, the rig changes mode instead of waiting for a second machine to mobilise.
Yes. The machine is CE certified, and Kaiao holds ISO 9001 at company level. We handle export documents and can arrange inspection at the factory before shipment.
Tengzhou Kaiao Construction Machinery Co., Ltd. started in 2004 and has spent more than twenty years building piling equipment. Development, production, sales, after-sales service and custom work all happen in our own factory, so your questions stay with one team instead of being passed between companies.
Customers from different countries come to the factory to see the machines running before they order, and to go through the drawings with our engineers. If you plan a visit, tell us the dates and the models you want to see.
Each rig is tested before it leaves, then loaded for the road or the container. We arrange the shipping documents and stay with the order until the machine is on site.
Tell us the pile diameter, the depth, the ground type and the site limits. We will tell you honestly whether this CFA piling rig is the right one, or whether a single-method machine does the job for less.
Email: [email protected]
Tel: +86 186 6320 9687
Factory: Tengfa Science and Technology Industrial Park, Shannan Road, Tengzhou City, Zaozhuang City, Shandong Province, 277500, China
Scan with WeChat. On a phone, save the image and scan it from your album.
Send us your project details and we will reply with a recommendation and a quotation.
Send an Email